: Use a level or plumb line to ensure the side walls and floor are perfectly horizontal and vertical.
: Typically, the combined door panels should be at least 10 cm wider than the opening to provide a sufficient overlap when closed. 2. Installing the Tracks instruktsiia po ustanovki dveri kupe
For , align the lower track with the top one using a level or plumb line. : Use a level or plumb line to
Lift the (the one further inside the closet) first. Installing the Tracks For , align the lower
You can often secure the bottom track initially with or "liquid nails" to test the door movement before permanently screwing it into the floor.
: Measure the opening in three places (top, middle, bottom for width; left, center, right for height).
For , you may use a small floor guide instead of a full track to keep the threshold clear. 3. Hanging the Doors