(e.g., PVC, Clay, Cast Iron, Concrete, Orangeburg). Pipe Diameter: (e.g., 4", 6", 8"). Pipe Length: Total distance surveyed. Direction of Survey: (e.g., With Flow / Against Flow).

2–4 high-resolution stills of the most critical defects found. 6. Sign-off Technician Signature: Confirms accuracy of the field data.

Scale of 1–5 (1: Minor, 5: Critical/Immediate Failure). Description: Structural: Cracks, fractures, collapses, or offset joints.

This section is typically a table where the technician logs specific footage markers. The exact distance from the starting point.

Unique identifier for the inspection. Date & Time: When the inspection took place. Property Address: Full location of the service. Customer/Client Name: Contact person or entity.

General status (e.g., Excellent, Fair, Poor). Action Required: No action needed. Schedule cleaning/hydro-jetting. Spot repair required. Full lining or replacement recommended.

Ground conditions (e.g., dry, heavy rain) that might affect flow. 2. Pipeline Specifications Asset ID: Manhole-to-manhole ID or specific lateral tag.

You cannot copy content of this page